2015 WASIT

Provision of personnel and equipment to carry out the post lay trenching of a 15 kV power composite cable in shallow water.

Location : WASIT field – Saudi Arabia
Client : Subtech Qatar Diving and Marine Services/ Saudi Aramco

Product : Power Composite Cable
Length (km): 9.2
Water depth (m) : 0 to 35
Vessel : Barge
Burial system : TM04 (trenching)
Burial depth (m) : 0.6 to 1.1
Weight (kg/m) : 16
Diameter : 106 mm