Home » Projets » 2005 PERENCO Gabon

2005 PERENCO Gabon

The purpose of this operation was to surface lay 70 kM of power cable in Peranco Gabon Fields, in water depth less than 35m.

Location : GABON (South of PORT-GENTIL)
Client : PERENCO France

Longueur (km): 72
Water depth (m) : 30
Vessel : DP Vessel
Burial system : N.A.
Burial depth (m) : N.A.
Product : Power Cable
Weight (kg/m) : 19
Diameter : 112 / 108 / 96 mm