Home » Projets » 2023 2 AFRICA MOZAMBIQUE

2023 2 AFRICA MOZAMBIQUE

1 x Direct landing at Nacala, shell installation, post-burial. Installing the grounding system

Location: Nacala, Mozmabique
Customer: ALCATEL SUBMARINE NETWORKS

Length (km): 1.4 km
Water depth (m) :
Vessel: N/A
Beam system: EBJ
Beam depth (m): 2m
Product : Fiber optic cable
cable type: ø37mm

Other projects

  • 2022 2 AFRICA MARSEILLE

    2 x Direct landing in Marseilles. Shell installation
    Burial system :
    Plus d’infos
  • 2014 SAFANIYA 2

    Provision of personnel and equipment to carry out the trenching of a 115 kV power composite cable in shallow water.
    Burial system : TM03 (trenching)
    Plus d’infos
  • 2007 ATLAS OFFSHORE

    FO cable shore ends – Post lay burial
    Burial system : EBJ 04 (jetting)
    Plus d’infos