Home » Projets » 2023 2 AFRICA MOZAMBIQUE

2023 2 AFRICA MOZAMBIQUE

1 x Direct landing at Nacala, shell installation, post-burial. Installing the grounding system

Location: Nacala, Mozmabique
Customer: ALCATEL SUBMARINE NETWORKS

Length (km): 1.4 km
Water depth (m) :
Vessel: N/A
Beam system: EBJ
Beam depth (m): 2m
Product : Fiber optic cable
cable type: ø37mm

Other projects

  • 1997 SOUTH KOREA

    Main land to Island / HVDC power cable extension with piggy-backed fibre optic cable
    Burial system : COPS (mattresses protection)
    Plus d’infos
  • 2013 AMX COLOMBIA

    2 separate shore ends at Cartagena and Barranquilla + Installation of mattresses.
    Burial system : EBJ (jetting)
    Plus d’infos
  • 2024 HAI LONG

    Post Lay Burial of EXP
    Burial system :
    Plus d’infos