Home » Projets » 2023 2 AFRICA MOZAMBIQUE

2023 2 AFRICA MOZAMBIQUE

1 x Direct landing at Nacala, shell installation, post-burial. Installing the grounding system

Location: Nacala, Mozmabique
Customer: ALCATEL SUBMARINE NETWORKS

Length (km): 1.4 km
Water depth (m) :
Vessel: N/A
Beam system: EBJ
Beam depth (m): 2m
Product : Fiber optic cable
cable type: ø37mm

Other projects

  • 2000 Dumpton Gap – Level 3

    Remedial work : Lay and simultaneous burial of fibre optic cable.
    Burial system : ESV11 (Plough)
    Plus d’infos
  • 2013 LONDON ARRAY

    Provision of personnel and equipment to carry out the post burial of 54 infield cables, some in very shallow water.
    Burial system : ROVJET605 (jetting)
    Plus d’infos
  • 2015 SEA LION Rostock

    1 shore end in Germany + Laying and burial of the same cable offshore in Denmark, in low water depths.
    Burial system : ROVJET404 + EBJ (jetting)
    Plus d’infos