Home » Projets » 2023 2 AFRICA MOZAMBIQUE

2023 2 AFRICA MOZAMBIQUE

1 x Direct landing at Nacala, shell installation, post-burial. Installing the grounding system

Location: Nacala, Mozmabique
Customer: ALCATEL SUBMARINE NETWORKS

Length (km): 1.4 km
Water depth (m) :
Vessel: N/A
Beam system: EBJ
Beam depth (m): 2m
Product : Fiber optic cable
cable type: ø37mm

Other projects

  • 2024 NIGERIA

    Separate landing in Lagos. 2.8 km of fibre-optic cable sunk in water
    Burial system :
    Plus d’infos
  • 2012 PAIMPOL BRÉHAT

    Main DC power cable installation between mainland and 15 km offshore as part of EDF’s tidal generation project.
    Burial system : TM03 (trencher)
    Plus d’infos
  • 2022 2 AFRICA Spain

    1 x Direct landing in Barcelona, shell installation and post-burial. Installation of grounding system
    Burial system :
    Plus d’infos