Home » Projets » 2024 NIGERIA

2024 NIGERIA

Separate landing in Lagos. 2.8 km of fiber-optic cable submerged in water

Location: Lagos, NIGERIA
Customer: ALCATEL SUBMARINE NETWORKS

Length (km): 2.8 km
Water depth (m):
Vessel: NORA B
Beam system: TO MOBILE / NV
Beam depth (m): 2.0 m
Product: Fiber-optic cable
Cable type: ø37 mm

Other projects

  • 2002 FLAG SOUTH PLIB

    PLIB works on telecommunication fibre optic cable.
    Burial system : MED1 (Dredge pump)
    Plus d’infos
  • 2023 YUNLIN

    Assistance to laying
    Burial system :
    Plus d’infos
  • 2021 AMITIE

    Separate shore ends in La Grigne. HDD Pulling, Laying and burial of 2.3 km of fibre optic cable.
    Burial system :
    Plus d’infos