2021 AMITIE

Separate shore ends in La Grigne. HDD Pulling, Laying and burial of 2.3 km of fibre optic cable.

Place: La Grigne (France)
Client : Alcatel Submarine Networks (ASN)

Product : fibre optic cable
Length:2.3 km
Depth: Up to 15 m
Ship: Barge
Burial system: Mass Flow Excavation
Burial depth: 1 m

Period: Sept 2021

Other projects

  • 2023 ANGOLA

    Separate landing in Luanda. Laying and post-wiring of 7.2 km of fiber-optic cable
    Burial system :
    Plus d’infos
  • 2024 2 AFRICA PEARLS

    1 x Direct landing in Salalah, shell installation, post-sinking. Installation of grounding system
    Burial system :
    Plus d’infos
  • 2011 ORMONDE WINDFARM

    Post Lay Inspection and Burial of 32 infield power cables.
    Burial system : ROVJET605 (jetting)
    Plus d’infos