Home » Projets » 2021 AMITIE

2021 AMITIE

Separate shore ends in La Grigne. HDD Pulling, Laying and burial of 2.3 km of fibre optic cable.

Place: La Grigne (France)
Client : Alcatel Submarine Networks (ASN)

Product : fibre optic cable
Length:2.3 km
Depth: Up to 15 m
Ship: Barge
Burial system: Mass Flow Excavation
Burial depth: 1 m

Period: Sept 2021

Other projects

  • 2025 PEARLS CABLE STORAGE

    Storage of fiber optic cable and repeaters in Bahrain
    Burial system :
    Plus d’infos
  • 2023 MARTINIQUE

    Installation of 2 new electrical links in the bay of Fort de France
    Burial system :
    Plus d’infos
  • 2015 AMRUMBANK

    Provision of personnel and equipment to carry out the post burial of 86 infield power cables.
    Burial system : ROVJET810 (jetting)
    Plus d’infos