2026 CSN-1 (USA)
Mobilization of the DP vessel Sarah Bordelon in Houma (Louisiana), followed by transit to Florida. Separate shore landing at Bonita Springs, lay and post-lay burial of 30 km of fiber optic cable, followed by a PLIB over approximately 100 km.
Location: Bonita Springs – Florida – USA
Client: ASN
Year: June – July 2026
Length (km): 30 km
Vessel: Sarah Bordelon
Burial system: TO Mobile NV
Product: Fiber optic cable




