Home » Projets » 2008 TAURT FIELD DEVELOPMENT

2008 TAURT FIELD DEVELOPMENT

Post trenching of subsea umbilical / PLIB

Location : Egypt
Client : Five Oceans Services – BP

Length (km): 64
Water depth (m) : 110
Vessel : DP Vessel
Burial system : ROVJET401 (Jetting)
Burial depth (m) : 1,5
Product : Umbilical
Weight (kg/m) : 5,9
Diameter : 104 mm

Other projects

  • 1999 DCN TOULON

    Power and composite cables inside miltary harbour.
    Burial system : N.A.
    Plus d’infos
  • 2020 Dunant

    Pre lay shore end. 5 km cable installation with laying and burial. Installation of articulated pipes.
    Burial system : TO Mobile (jetting)
    Plus d’infos
  • 2005 SEA-ME-WE 4

    Direct shore ends / Laying and burial of FO cable
    Burial system : Dredge pump (with divers)
    Plus d’infos