Home » Projets » 1996 THAILANDE

1996 THAILANDE

Mainland to KO SAMUI Island /Laying and burial of 115 kV power cable

Location : THAILAND / MAIN LAND to KO SAMUI
Client : ALCATEL / PEA

Length (km): 24
Water depth (m) : 26
Vessel : Barge
Burial system : TM02 (Trencher) – TJV04 (Jetting)
BD (m) : 1,5
Product : Power cable
Weight (kg/m) : 46
Diameter : 135 mm

Other projects

  • 2002 FLAG SOUTH PLIB

    PLIB works on telecommunication fibre optic cable.
    Burial system : MED1 (Dredge pump)
    Plus d’infos
  • 2015 ILE D’YEU

    Surface laying of 2 sections of power cable YEU3 and YEU4.
    Burial system : N.A.
    Plus d’infos
  • 2011 DELMA REPAIR

    Provision of submarine power cable repair assistance.
    Burial system : Dredge pump (with divers)
    Plus d’infos