Home » Projets » 1996 THAILANDE

1996 THAILANDE

Mainland to KO SAMUI Island /Laying and burial of 115 kV power cable

Location : THAILAND / MAIN LAND to KO SAMUI
Client : ALCATEL / PEA

Length (km): 24
Water depth (m) : 26
Vessel : Barge
Burial system : TM02 (Trencher) – TJV04 (Jetting)
BD (m) : 1,5
Product : Power cable
Weight (kg/m) : 46
Diameter : 135 mm

Other projects

  • 2015 ABU ALI

    Provision of personnel and equipment to carry out the post lay trenching of a 15 kV power composite cable.
    Burial system : TM03 (trenching)
    Plus d’infos
  • 2019 SAFANIYA 6

    Provision of personnel and equipment to carry out the trenching of 11 submarine cables, umbilicals and flexibles on Safaniya 6 field.
    Burial system : TM03 (trencher)
    Plus d’infos
  • 2017 BEATRICE OWF

    Provision of personnel and equipment to carry out the post lay burial of 56 infield power cables.
    Burial system : ROVJET 1210 (jetting)
    Plus d’infos