Home » Projets » 2019 SAFANIYA 6

2019 SAFANIYA 6

Provision of personnel and equipment to carry out the trenching of 11 submarine cables, umbilicals and flexibles on Safaniya 6 field.

Location : Safaniya 6 field – Saudi Arabia
Client : Mc Dermott Arabia Company Ltd

Product : Power Cable / Umbilical / Flexible
Length (km): 18.6 km
Water depth (m) : 7.5
Vessel : Barge
Burial system : TM03 (trencher)
Burial depth (m) : 1
Weight (kg/m) : up to 84 (for 115 kV power cables)
Diameter (mm) : up to 215 (for 115 kV power cables)

Other projects

  • 2005 FALCON

    Separate shore ends / Laying and burial of FO cable
    Burial system : TJV05 – EBJ03 (Jetting)
    Plus d’infos
  • 1998 BELIZE

    Main land to island / 34.5 kV power extension.
    Burial system : TJV04 (Jetting)
    Plus d’infos
  • 2008 KASHAGAN

    Fibre optic cable laying and burial between Island D and Atyrau (Kazahkstan)
    Burial system : TM03 (Trencher) + ESV12 (Plough)
    Plus d’infos