Home » Projets » 2017 BEATRICE OWF

2017 BEATRICE OWF

Provision of personnel and equipment to carry out the post lay burial of 56 infield power cables.

Location : Beatrice Offshore Windfarm / North sea 
Client : Seaway Offshore Cables

Product : Power Cable 
Length (km): 93
Water depth (m) : up to 55 m
Vessel : DP Vessel
Burial system : ROVJET1210 (jetting)
Burial depth (m) : 0.8

Other projects

  • 2013 ANHOLT

    Post Lay Inspection and Burial of 111 infield power cables
    Burial system : ROVJET806 (jetting)
    Plus d’infos
  • 1999 DCN TOULON

    Power and composite cables inside miltary harbour.
    Burial system : N.A.
    Plus d’infos
  • 2008 PERENCO RDC

    Cable laying and burial between mainland and platforms. Barge operating for pipe laying + special liftings + J-tube pullin.
    Burial system : EBJ 04 (jetting)
    Plus d’infos