Provision of personnel and equipment to carry out the post lay burial of 56 infield power cables.

Location : Beatrice Offshore Windfarm / North sea 
Client : Seaway Offshore Cables

Product : Power Cable 
Length (km): 93
Water depth (m) : up to 55 m
Vessel : DP Vessel
Burial system : ROVJET1210 (jetting)
Burial depth (m) : 0.8