Home » Projets » 1998-1999 VNF PARIS

1998-1999 VNF PARIS

Along river / Laying and burial of 3 multiple FO cables laid in one go.

Location : FRANCE / NEUILLY-CONFLANS – SEINE River
Client : MCI WORLDCOM, LD COM NETWORKS, VIATEL, TELIA

Length (km): 850
Water depth (m) : 15
Vessel : Spub Barge / River Barge
Burial system : ESV 07 / ESV11 (Plough)
BD (m) : 0,75
Product : Fibre optic cable
Weight (kg/m) : 2
Diameter : 25 mm

Other projects

  • 2001 ANTARES

    Cable lay between LA SEYNE SUR MER and the Neutrinos Telescope ANTARES (max. depth 2400 m).
    Burial system : N.A.
    Plus d’infos
  • 2014 SAFANIYA 2

    Provision of personnel and equipment to carry out the trenching of a 115 kV power composite cable in shallow water.
    Burial system : TM03 (trenching)
    Plus d’infos
  • 2023 YUNLIN

    Assistance to laying
    Burial system :
    Plus d’infos