Home » Projets » 1998-1999 VNF PARIS

1998-1999 VNF PARIS

Along river / Laying and burial of 3 multiple FO cables laid in one go.

Location : FRANCE / NEUILLY-CONFLANS – SEINE River
Client : MCI WORLDCOM, LD COM NETWORKS, VIATEL, TELIA

Length (km): 850
Water depth (m) : 15
Vessel : Spub Barge / River Barge
Burial system : ESV 07 / ESV11 (Plough)
BD (m) : 0,75
Product : Fibre optic cable
Weight (kg/m) : 2
Diameter : 25 mm

Other projects

  • 2011 WALNEY 2

    Post Lay Inspection and Burial of 51 infield power cables.
    Burial system : ROVJET605 (jetting)
    Plus d’infos
  • 2023 MUANDA

    Separate landing at Muanda. Laying and post-wiring of 22 km of fiber optic cable
    Burial system :
    Plus d’infos
  • 2024 DOGGER BANK B

    Supply of trenching support services, including personnel and equipment on board a dedicated trenching support vessel (TSV), for the Dogger Bank offshore wind farm inter-turbine cable installation and protection project.
    Burial system :
    Plus d’infos