Home » Projets » 1998 VNF SUD FRANCE

1998 VNF SUD FRANCE

Along river – canal / Dual fibre optic cable.

Location : FRANCE / FOS – MONTPELLIER
Client : MCI WORLDCOM / LD COM NETWORKS

Length (km): 90
Water depth (m) : 6,5
Vessel : Spud Barge
Burial system : EBJ 02 (jetting)
Burial depth (m) : 0,5
Product : Fibre optic cable
Weight (kg/m) : 2
Diameter : 24 mm

Other projects

  • 2023 GABON

    Separate landing in Libreville. Laying and post-wiring of 16.9 km of fiber optic cable
    Burial system :
    Plus d’infos
  • 2024 ZHONG NENG

    Assistance to laying
    Burial system :
    Plus d’infos
  • 2015 FITZROY Port Hedland

    2 separate shore ends. Double 44km cable installation with simultaneous laying and trenching and then surface lay.
    Burial system : TM04 (trenching) + EBJ (jetting)
    Plus d’infos