Home » Projets » 1998 VNF SUD FRANCE

1998 VNF SUD FRANCE

Along river – canal / Dual fibre optic cable.

Location : FRANCE / FOS – MONTPELLIER
Client : MCI WORLDCOM / LD COM NETWORKS

Length (km): 90
Water depth (m) : 6,5
Vessel : Spud Barge
Burial system : EBJ 02 (jetting)
Burial depth (m) : 0,5
Product : Fibre optic cable
Weight (kg/m) : 2
Diameter : 24 mm

Other projects

  • 2025 CSN-1 PANAMA

    Separate landing at Costa del Este. Laying and post-wiring of 11.8 km of fiber optic cable
    Burial system :
    Plus d’infos
  • 2013 ANHOLT

    Post Lay Inspection and Burial of 111 infield power cables
    Burial system : ROVJET806 (jetting)
    Plus d’infos
  • 2025 NOY YEU NOIRMOUTIER WINDFARM

    EPCI contract for the supply, installation and protection of inter-wind turbine cables for the YEU NOIRMOUTIER offshore wind farm.
    Burial system :
    Plus d’infos