Home » Projets » 2025 NOY YEU NOIRMOUTIER WINDFARM

2025 NOY YEU NOIRMOUTIER WINDFARM

EPCI contract for the supply, installation and protection of inter-wind turbine cables for the YEU NOIRMOUTIER offshore wind farm.

Location: France
Customer: Eoliennes en mer Services

Length (km): 35 km
Water depth (m): 17 m
Vessel: GEOQUIP ELENA
Trenching system: Cable laying with shells
Trenching depth (m): N/A
Product : Power cable
cable type:

Other projects

  • 2023 BLUE GENOA

    2 x Direct landings at Genoa in a directional borehole. Shell installation
    Burial system :
    Plus d’infos
  • 2014 GÉOCEAN BÉNIN

    Laying of 14km of power cable between mainland and a platform. Burial in shallow water from 8m to the beach.
    Burial system : EBJ (jetting)
    Plus d’infos
  • 2015 QUIBERON BELLE ISLE 4

    Laying of 14.5 km of hybrid cable between Quiberon and Belle Isle.
    Burial system : N.A.
    Plus d’infos