EPCI contract for the supply, installation and protection of inter-wind turbine cables for the YEU NOIRMOUTIER offshore wind farm.

Location: France
Customer: Eoliennes en mer Services

Length (km): 35 km
Water depth (m): 17 m
Vessel: GEOQUIP ELENA
Trenching system: Cable laying with shells
Trenching depth (m): N/A
Product : Power cable
cable type:

Other projects

  • 2015 SEA LION Rostock

    1 shore end in Germany + Laying and burial of the same cable offshore in Denmark, in low water depths.
    Burial system : ROVJET404 + EBJ (jetting)
    Plus d’infos
  • 2009 KASHAGAN

    Provison of burial services for 1 power cable and 2 umbilicals.
    Burial system : TM03 (Trencher)
    Plus d’infos
  • 2014 BUTENDIEK

    Provision of personnel and equipment to carry out the post burial of 86 infield power cables.
    Burial system : ROVJET806 (jetting)