Home » Projets » 2025 NOY YEU NOIRMOUTIER WINDFARM

2025 NOY YEU NOIRMOUTIER WINDFARM

EPCI contract for the supply, installation and protection of inter-wind turbine cables for the YEU NOIRMOUTIER offshore wind farm.

Location: France
Customer: Eoliennes en mer Services

Length (km): 35 km
Water depth (m): 17 m
Vessel: GEOQUIP ELENA
Trenching system: Cable laying with shells
Trenching depth (m): N/A
Product : Power cable
cable type:

Other projects

  • 1997 SOUTH KOREA

    Main land to Island / HVDC power cable extension with piggy-backed fibre optic cable
    Burial system : COPS (mattresses protection)
    Plus d’infos
  • 2013 LONDON ARRAY

    Provision of personnel and equipment to carry out the post burial of 54 infield cables, some in very shallow water.
    Burial system : ROVJET605 (jetting)
    Plus d’infos
  • 2017 QUINTILLION ALASKA

    1 separate shore end. 16 km cable installation with laying and burial.
    Burial system : ESV12 (vibrating plough)
    Plus d’infos