Home » Projets » 2025 CSN-1 PANAMA

2025 CSN-1 PANAMA

Separate landing at Costa del Este. Laying and post-wiring of 11.8 km of fiber-optic cable

Location: Costa del Este, Panama
Customer: ALCATEL SUBMARINE NETWORKS

Length (km): 11.8 km
Water depth (m) :
Vessel: BARGE DP
Trenching system: TO MOBILE
Trenching depth (m): 2m
Product: Fiber optic cable
cable type: ø37mm

Other projects

  • 2021 Saint Nazaire OWF

    EPCI contract for the Saint-Nazaire OWF Inter-array Cables Procurement, Installation and protection
    Burial system :
    Plus d’infos
  • 2005 SEA-ME-WE 4

    Direct shore ends / Laying and burial of FO cable
    Burial system : Dredge pump (with divers)
    Plus d’infos
  • 2023 CONGO

    Separate landing at Pointe Noire. Laying and post-wiring of 8.8 km of fiber optic cable
    Burial system :
    Plus d’infos