Home » Projets » 2025 CSN-1 PANAMA

2025 CSN-1 PANAMA

Separate landing at Costa del Este. Laying and post-wiring of 11.8 km of fiber-optic cable

Location: Costa del Este, Panama
Customer: ALCATEL SUBMARINE NETWORKS

Length (km): 11.8 km
Water depth (m) :
Vessel: BARGE DP
Trenching system: TO MOBILE
Trenching depth (m): 2m
Product: Fiber optic cable
cable type: ø37mm

Other projects

  • 2000 PEC / LEVEL 3/ FLUTE

    PLIB works on telecom fibre optic cable crossings.
    Burial system : MED 1: Dredge pump / jetting tool
    Plus d’infos
  • 2005 PERENCO Gabon

    Mainland to platforms. Surface lay + J-tube Pull-In
    Burial system : N.A.
    Plus d’infos
  • 2023 MUANDA

    Separate landing at Muanda. Laying and post-wiring of 22 km of fiber optic cable
    Burial system :
    Plus d’infos