Home » Projets » 2001 SAT 3

2001 SAT 3

DOUALA and LIBREVILLE shore ends / Laying and burial of FO cable

Location : CAMEROON and GABON
Client : SAT 3 WASC (ALCATEL SUBMARINE NETWORKS)

Length (km): 79
Water depth (m) : 20
Vessel : Barge
Burial system : TJV05 – TJV04 (Jetting) + ESV12 (Plough)
Burial depth (m) : 2
Product : Fibre optic cable
Weight (kg/m) : 5,8
Diameter : 46 mm

Other projects

  • 2025 NOY YEU NOIRMOUTIER WINDFARM

    EPCI contract for the supply, installation and protection of inter-wind turbine cables for the YEU NOIRMOUTIER offshore wind farm.
    Burial system :
    Plus d’infos
  • 1999 ELGIN FRANKLIN

    Platform to platform / Composite power and communication cable + 1 composite power / communication cable + 1 umbilical.
    Burial system : CASTOR 2 (Trencher)
    Plus d’infos
  • 2017 IFA 2000 CABLES REPAIR

    Repair of 4 power cables being part of the IFA 2000 link .
    Burial system : MED 1 (Dredge pump) + ROVJET806 (jetting)
    Plus d’infos