Home » Projets » 2001 SAT 3

2001 SAT 3

DOUALA and LIBREVILLE shore ends / Laying and burial of FO cable

Location : CAMEROON and GABON
Client : SAT 3 WASC (ALCATEL SUBMARINE NETWORKS)

Length (km): 79
Water depth (m) : 20
Vessel : Barge
Burial system : TJV05 – TJV04 (Jetting) + ESV12 (Plough)
Burial depth (m) : 2
Product : Fibre optic cable
Weight (kg/m) : 5,8
Diameter : 46 mm

Other projects

  • 2023 2 AFRICA SOUTH AFRICA

    1 x Direct landing in Port Elizabeth, shell installation, post beaching, clamp installation. Installation of grounding system
    Burial system :
    Plus d’infos
  • 2022 GRACE HOPPER

    Separate landing in a directional borehole. Simultaneous installation and beaming with mechanical trencher
    Burial system :
    Plus d’infos
  • 2024 DOGGER BANK B

    Supply of trenching support services, including personnel and equipment on board a dedicated trenching support vessel (TSV), for the Dogger Bank offshore wind farm inter-turbine cable installation and protection project.
    Burial system :
    Plus d’infos