Home » Projets » 2001 SAT 3

2001 SAT 3

DOUALA and LIBREVILLE shore ends / Laying and burial of FO cable

Location : CAMEROON and GABON
Client : SAT 3 WASC (ALCATEL SUBMARINE NETWORKS)

Length (km): 79
Water depth (m) : 20
Vessel : Barge
Burial system : TJV05 – TJV04 (Jetting) + ESV12 (Plough)
Burial depth (m) : 2
Product : Fibre optic cable
Weight (kg/m) : 5,8
Diameter : 46 mm

Other projects

  • 2005 ORASCOM MED CABLE

    MED CABLE direct shore ends (FO)
    Burial system : TJV07 (Jetting)
    Plus d’infos
  • 2014 WINTERSHALL

    Provision of personnel and equipment to carry out the post burial of 1 umbilical between 2 offshore platforms.
    Burial system : ROVJET806 (jetting)
    Plus d’infos
  • 2008 PERENCO RDC

    Cable laying and burial between mainland and platforms. Barge operating for pipe laying + special liftings + J-tube pullin.
    Burial system : EBJ 04 (jetting)
    Plus d’infos