Home » Projets » 2001 SAT 3

2001 SAT 3

DOUALA and LIBREVILLE shore ends / Laying and burial of FO cable

Location : CAMEROON and GABON
Client : SAT 3 WASC (ALCATEL SUBMARINE NETWORKS)

Length (km): 79
Water depth (m) : 20
Vessel : Barge
Burial system : TJV05 – TJV04 (Jetting) + ESV12 (Plough)
Burial depth (m) : 2
Product : Fibre optic cable
Weight (kg/m) : 5,8
Diameter : 46 mm

Other projects

  • 2010 HONOTUA

    FO cable shore ends, PLIB and installation of articulated pipes.
    Burial system : Dredge pump (with divers)
    Plus d’infos
  • 2016 FITZROY Darwin

    1 separate shore end. 3km cable installation with laying and post burial. Installation of articulated pipes.
    Burial system : TO Mobile (jetting)
    Plus d’infos
  • 2003 AL KHAFJI

    Laying and burial of 40 km of power cable in Saudi Arabia.
    Burial system : TM02 (Trencher)
    Plus d’infos