2023 MUANDA

Separate landing at Muanda. Laying and post-wiring of 22 km of fiber optic cable

Location: Muanda – DRC
Customer : ALCATEL SUBMARINE NETWORKS

Length (km): 22 km
Water depth (m) :
Vessel: NORA B
Beam system: TO MOBILE / NV
Beam depth (m): 2.0 m
Product : Fiber optic cable
cable type: ø37mm