2023 MUANDA

Separate landing at Muanda. Laying and post-wiring of 22 km of fiber optic cable

Location: Muanda – DRC
Customer : ALCATEL SUBMARINE NETWORKS

Length (km): 22 km
Water depth (m) :
Vessel: NORA B
Beam system: TO MOBILE / NV
Beam depth (m): 2.0 m
Product : Fiber optic cable
cable type: ø37mm

Other projects

  • 2022 2 AFRICA SOUTH AFRICA

    1 x Direct landing at Duynfontein, shell installation and post-burial. Installation of grounding system
    Burial system :
    Plus d’infos
  • 2001 I 2 I / Shore end MADRAS

    Cable lay and burial – 8 km CHENNAI shore end.
    Burial system : TJV05 + TJV04 (Jetting) + ESV07 (Plough)
    Plus d’infos
  • 2025 MARJAN GOSP 4

    Supply of personnel and trenching services for two separate 230 kV composite submarine cable burial services on the Marjan field as part of the Marjan Oil-Gas Separation Plant No. 4 (MRJN GOSP 4) development project.
    Burial system :
    Plus d’infos