Home » Projets » 2023 MUANDA

2023 MUANDA

Separate landing at Muanda. Laying and post-wiring of 22 km of fiber optic cable

Location: Muanda – DRC
Customer : ALCATEL SUBMARINE NETWORKS

Length (km): 22 km
Water depth (m) :
Vessel: NORA B
Beam system: TO MOBILE / NV
Beam depth (m): 2.0 m
Product : Fiber optic cable
cable type: ø37mm

Other projects

  • 2013 AMX COLOMBIA

    2 separate shore ends at Cartagena and Barranquilla + Installation of mattresses.
    Burial system : EBJ (jetting)
    Plus d’infos
  • 2021 AMITIE

    Separate shore ends in La Grigne. HDD Pulling, Laying and burial of 2.3 km of fibre optic cable.
    Burial system :
    Plus d’infos
  • 2012 THORNTON BANK

    Post-Lay burial of the export power cable of the Thornton Bank Offshore Windfarm.
    Burial system : ROVJET605 + ROVJET806 (jetting)
    Plus d’infos