Home » Projets » 2023 MUANDA

2023 MUANDA

Separate landing at Muanda. Laying and post-wiring of 22 km of fiber optic cable

Location: Muanda – DRC
Customer : ALCATEL SUBMARINE NETWORKS

Length (km): 22 km
Water depth (m) :
Vessel: NORA B
Beam system: TO MOBILE / NV
Beam depth (m): 2.0 m
Product : Fiber optic cable
cable type: ø37mm

Other projects

  • 2024 ZHONG NENG

    Assistance to laying
    Burial system :
    Plus d’infos
  • 2025 MARJAN GOSP 4

    Supply of personnel and trenching services for two separate 230 kV composite submarine cable burial services on the Marjan field as part of the Marjan Oil-Gas Separation Plant No. 4 (MRJN GOSP 4) development project.
    Burial system :
    Plus d’infos
  • 2016 NORDSEE ONE

    Provision of personnel and equipment to carry out the post lay burial of 54 infield power cables.
    Burial system : ROVJET 810 (jetting)
    Plus d’infos