Home » Projets » 2001 ULYSSE

2001 ULYSSE

Recover of existing cable (5 km), simultaneous lay and burial work (ESV12), PLIB work of joints (MED 1 and diver pump).

Location : ENGLISH CHANNEL
Client : ULYSSES 1 South FO Cable (MCI WORLDCOM)

Length (km): 5,1
Water depth (m) : 35
Vessel : Barge
Burial system : MED1 (Dredge pump) – ESV12 (Plough)
Burial depth (m) : 2
Product : Fibre optic cable
Weight (kg/m) : 9,7
Diameter : 57 mm

Other projects

  • 2015 FITZROY Port Hedland

    2 separate shore ends. Double 44km cable installation with simultaneous laying and trenching and then surface lay.
    Burial system : TM04 (trenching) + EBJ (jetting)
    Plus d’infos
  • 2006 JAKASUSI

    FO cable shore ends / Laying and burial
    Burial system : EBJ 04 (jetting)
    Plus d’infos
  • 2025 2 AFRICA PEARLS

    Separate landing at Al Khobar. Laying and post-wiring of 35 km of fiber optic cable
    Burial system :