2007 PICOT / GONDWANA

FO cable shore ends – Post lay burial

Location : New Caledonia / Australia
Client : ALCATEL LUCENT

Length (km): 3
Water depth (m) : 20
Vessel : Inflatable / works craft 
Burial system : EBJ 04 (jetting)
Burial depth (m) : 2
Product : Fibre optic cable
Weight (kg/m) : 3,5
Diameter : 35 mm

Other projects

  • 1998 BELIZE

    Main land to island / 34.5 kV power extension.
    Burial system : TJV04 (Jetting)
    Plus d’infos
  • 2023 ZAKYNTIS

    LD Travocean was subcontracted by Asso Subsea for trenching work. ROVJET 1217 was deployed on the TSV MV Astrea to carry out PLB water jet cleaning on the 21 km electrical interconnection.
    Burial system :
    Plus d’infos
  • 2020 Partnership with UXO Control

    Offshore campaign to identify and eliminate unexposed ammunition (UXO) on the site of the Saint-Brieuc wind farm
    Burial system : TRITON XLX200HP and ROV C 113
    Plus d’infos