Home » Projets » 2007 PICOT / GONDWANA

2007 PICOT / GONDWANA

FO cable shore ends – Post lay burial

Location : New Caledonia / Australia
Client : ALCATEL LUCENT

Length (km): 3
Water depth (m) : 20
Vessel : Inflatable / works craft 
Burial system : EBJ 04 (jetting)
Burial depth (m) : 2
Product : Fibre optic cable
Weight (kg/m) : 3,5
Diameter : 35 mm

Other projects

  • 2011 DELMA REPAIR

    Provision of submarine power cable repair assistance.
    Burial system : Dredge pump (with divers)
    Plus d’infos
  • 2024 2 AFRICA

    PLIB in various West African countries
    Burial system :
    Plus d’infos
  • 2010 HONOTUA

    FO cable shore ends, PLIB and installation of articulated pipes.
    Burial system : Dredge pump (with divers)
    Plus d’infos