Home » Projets » 2008 TAURT FIELD DEVELOPMENT

2008 TAURT FIELD DEVELOPMENT

Post trenching of subsea umbilical / PLIB

Location : Egypt
Client : Five Oceans Services – BP

Length (km): 64
Water depth (m) : 110
Vessel : DP Vessel
Burial system : ROVJET401 (Jetting)
Burial depth (m) : 1,5
Product : Umbilical
Weight (kg/m) : 5,9
Diameter : 104 mm

Other projects

  • 2025 CSN-1 COLOMBIA

    Separate landing in Barranquilla. Laying and post-wiring of 8.5 km of fiber optic cable, Installation of grounding system
    Burial system :
    Plus d’infos
  • 2012 THORNTON BANK

    Post-Lay burial of the export power cable of the Thornton Bank Offshore Windfarm.
    Burial system : ROVJET605 + ROVJET806 (jetting)
    Plus d’infos
  • 2016 AL NASR QAFFAY

    Cable laying and burial between mainland and Qaffay Island.
    Burial system : TM04 (trenching)
    Plus d’infos