2008 TAURT FIELD DEVELOPMENT

Post trenching of subsea umbilical / PLIB

Location : Egypt
Client : Five Oceans Services – BP

Length (km): 64
Water depth (m) : 110
Vessel : DP Vessel
Burial system : ROVJET401 (Jetting)
Burial depth (m) : 1,5
Product : Umbilical
Weight (kg/m) : 5,9
Diameter : 104 mm