Home » Projets » 2010 HONOTUA

2010 HONOTUA

FO cable shore ends, PLIB and installation of articulated pipes.

Location : Bora Bora, Huaihina, Raiatea, Moorea, Papenoo
Client : ASN

Length (km): 3
Water depth (m) : 30
Vessel : N.A.
Burial system : Dredge pump (with divers)
Burial depth (m) : 0.2
Product : Fibre optic cable
Weight (kg/m) : 3,9
Diameter : 38 mm

Other projects

  • 2002 FLAG SOUTH PLIB

    PLIB works on telecommunication fibre optic cable.
    Burial system : MED1 (Dredge pump)
    Plus d’infos
  • 2020 TANNAT and MALBEC Systems

    Separate landing. Laying and burial of 2 fiber optic cables in Las Toninas (Argentina). Installation of shells.
    Burial system : ROVJET 404
    Plus d’infos
  • 2012 PAIMPOL BRÉHAT

    Main DC power cable installation between mainland and 15 km offshore as part of EDF’s tidal generation project.
    Burial system : TM03 (trencher)
    Plus d’infos