Home » Projets » 2010 HONOTUA

2010 HONOTUA

FO cable shore ends, PLIB and installation of articulated pipes.

Location : Bora Bora, Huaihina, Raiatea, Moorea, Papenoo
Client : ASN

Length (km): 3
Water depth (m) : 30
Vessel : N.A.
Burial system : Dredge pump (with divers)
Burial depth (m) : 0.2
Product : Fibre optic cable
Weight (kg/m) : 3,9
Diameter : 38 mm

Other projects

  • 2022 2 AFRICA SOUTH AFRICA

    1 x Direct landing at Duynfontein, shell installation and post-burial. Installation of grounding system
    Burial system :
    Plus d’infos
  • 2017 IFA 2000 CABLES REPAIR

    Repair of 4 power cables being part of the IFA 2000 link .
    Burial system : MED 1 (Dredge pump) + ROVJET806 (jetting)
    Plus d’infos
  • 2020 TANNAT and MALBEC Systems

    Separate landing. Laying and burial of 2 fiber optic cables in Las Toninas (Argentina). Installation of shells.
    Burial system : ROVJET 404
    Plus d’infos