Home » Projets » 2010 HONOTUA

2010 HONOTUA

FO cable shore ends, PLIB and installation of articulated pipes.

Location : Bora Bora, Huaihina, Raiatea, Moorea, Papenoo
Client : ASN

Length (km): 3
Water depth (m) : 30
Vessel : N.A.
Burial system : Dredge pump (with divers)
Burial depth (m) : 0.2
Product : Fibre optic cable
Weight (kg/m) : 3,9
Diameter : 38 mm

Other projects

  • 2001 ULYSSE

    Recover of existing cable (5 km), simultaneous lay and burial work (ESV12), PLIB work of joints (MED 1 and diver pump).
    Burial system : MED1 (Dredge pump) – ESV12 (Plough)
    Plus d’infos
  • 2011 DELMA REPAIR

    Provision of submarine power cable repair assistance.
    Burial system : Dredge pump (with divers)
    Plus d’infos
  • 2020 Dunant

    Pre lay shore end. 5 km cable installation with laying and burial. Installation of articulated pipes.
    Burial system : TO Mobile (jetting)
    Plus d’infos