Home » Projets » 2010 HONOTUA

2010 HONOTUA

FO cable shore ends, PLIB and installation of articulated pipes.

Location : Bora Bora, Huaihina, Raiatea, Moorea, Papenoo
Client : ASN

Length (km): 3
Water depth (m) : 30
Vessel : N.A.
Burial system : Dredge pump (with divers)
Burial depth (m) : 0.2
Product : Fibre optic cable
Weight (kg/m) : 3,9
Diameter : 38 mm

Other projects

  • 2022 HORNSEA 2

    Assistance to laying, PLIB
    Burial system :
    Plus d’infos
  • 2015 WASIT

    Provision of personnel and equipment to carry out the post lay trenching of a 15 kV power composite cable.
    Burial system : TM04 (trenching)
    Plus d’infos
  • 2015 FITZROY Port Hedland

    2 separate shore ends. Double 44km cable installation with simultaneous laying and trenching and then surface lay.
    Burial system : TM04 (trenching) + EBJ (jetting)
    Plus d’infos