Home » Projets » 2010 HONOTUA

2010 HONOTUA

FO cable shore ends, PLIB and installation of articulated pipes.

Location : Bora Bora, Huaihina, Raiatea, Moorea, Papenoo
Client : ASN

Length (km): 3
Water depth (m) : 30
Vessel : N.A.
Burial system : Dredge pump (with divers)
Burial depth (m) : 0.2
Product : Fibre optic cable
Weight (kg/m) : 3,9
Diameter : 38 mm

Other projects

  • 1998-1999 VNF PARIS

    Along river / Laying and burial of 3 multiple FO cables laid in one go
    Burial system : ESV 07 / ESV11 (Plough)
    Plus d’infos
  • 1999 DCN TOULON

    Power and composite cables inside miltary harbour.
    Burial system : N.A.
    Plus d’infos
  • 2016 VEJA MATE

    Provision of personnel and equipment to carry out the post lay burial of 73 infield power cables.
    Burial system : ROVJET 810 (jetting)
    Plus d’infos