2010 HONOTUA

FO cable shore ends, PLIB and installation of articulated pipes.

Location : Bora Bora, Huaihina, Raiatea, Moorea, Papenoo
Client : ASN

Length (km): 3
Water depth (m) : 30
Vessel : N.A.
Burial system : Dredge pump (with divers)
Burial depth (m) : 0.2
Product : Fibre optic cable
Weight (kg/m) : 3,9
Diameter : 38 mm

Other projects

  • 2004 SIR BANIYAS

    Lay and burial of 2×9 km of 33kV power cable between Jebel Dhanna and SIR BANIYAS (mainland to Island)
    Burial system : TM03 (Trencher)
    Plus d’infos
  • 2023 MUANDA

    Separate landing at Muanda. Laying and post-wiring of 22 km of fiber optic cable
    Burial system :
    Plus d’infos
  • 2000 FLAG ATLANTIC 1

    3 separate shore end installations as part of the FLAG Atlantic 1 telecommunication cable system.
    Burial system : MED1 (Jetting) and ESV11 (Plough)
    Plus d’infos