Home » Projets » 2010 HONOTUA

2010 HONOTUA

FO cable shore ends, PLIB and installation of articulated pipes.

Location : Bora Bora, Huaihina, Raiatea, Moorea, Papenoo
Client : ASN

Length (km): 3
Water depth (m) : 30
Vessel : N.A.
Burial system : Dredge pump (with divers)
Burial depth (m) : 0.2
Product : Fibre optic cable
Weight (kg/m) : 3,9
Diameter : 38 mm

Other projects

  • 2014 WINTERSHALL

    Provision of personnel and equipment to carry out the post burial of 1 umbilical between 2 offshore platforms.
    Burial system : ROVJET806 (jetting)
    Plus d’infos
  • 2023 CONGO

    Separate landing at Pointe Noire. Laying and post-wiring of 8.8 km of fiber optic cable
    Burial system :
    Plus d’infos
  • 2020 Dunant

    Pre lay shore end. 5 km cable installation with laying and burial. Installation of articulated pipes.
    Burial system : TO Mobile (jetting)
    Plus d’infos