2023 SeaGreen

Assistance to laying, PLIB

Location: UK Northesea
Customer: SEAWAY 7

Length (km): 167 km
Water depth (m) :
Vessel: Seaway AimeryS
Beaching system: ROVJET 1210
Beaching depth (m): 1.5m
Product : Power cable
cable type: ø