Home » Projets » 2023 SeaGreen

2023 SeaGreen

Assistance to laying, PLIB

Location: UK Northesea
Customer: SEAWAY 7

Length (km): 167 km
Water depth (m) :
Vessel: Seaway AimeryS
Beaching system: ROVJET 1210
Beaching depth (m): 1.5m
Product : Power cable
cable type: ø

Other projects

  • 2014 GÉOCEAN BÉNIN

    Laying of 14km of power cable between mainland and a platform. Burial in shallow water from 8m to the beach.
    Burial system : EBJ (jetting)
    Plus d’infos
  • 2018 ASC Indonesia

    Post lay inspection and burial of 41 km of fibre optic cable.
    Burial system : ROVJET 605 (jetting)
    Plus d’infos
  • 2016 VEJA MATE

    Provision of personnel and equipment to carry out the post lay burial of 73 infield power cables.
    Burial system : ROVJET 810 (jetting)
    Plus d’infos