Home » Projets » 2023 SeaGreen

2023 SeaGreen

Assistance to laying, PLIB

Location: UK Northesea
Customer: SEAWAY 7

Length (km): 167 km
Water depth (m) :
Vessel: Seaway AimeryS
Beaching system: ROVJET 1210
Beaching depth (m): 1.5m
Product : Power cable
cable type: ø

Other projects

  • 2016 NORDSEE ONE

    Provision of personnel and equipment to carry out the post lay burial of 54 infield power cables.
    Burial system : ROVJET 810 (jetting)
    Plus d’infos
  • 2025 2 AFRICA PEARLS BARHEIN

    Separate landing in Bahrain. Laying and post-wiring 35 km of fiber optic cable
    Burial system :
    Plus d’infos
  • 2011 WALNEY 2

    Post Lay Inspection and Burial of 51 infield power cables.
    Burial system : ROVJET605 (jetting)
    Plus d’infos