Home » Projets » 2015 QUIBERON BELLE ISLE 4

2015 QUIBERON BELLE ISLE 4

Laying of 14.5 km of hybrid cable between Quiberon (mainland) and Belle Isle.
Location : Quiberon – Belle Isle  (Brittany)
Client : ERDF
Length (km): 14.5
Water depth (m) : 0 to 25
Vessel : DP vessel
Burial system : N.A.
Burial depth (m) : N.A.
Product : Hybrid Cable (Power + FO)
Weight (kg/m) : 29
Diameter : 122 mm

Other projects

  • 2015 MANIFA

    Provision of personnel and equipment to carry out the trenching of 3 power cables and 2 fiber optic cables.
    Burial system : TM03 (trencher)
    Plus d’infos
  • 2023 BLUE BASTIA

    1 x Direct landing in Bastia, shell installation, post-burial, anchor installation with posidonies
    Burial system :
    Plus d’infos
  • 2014 EMF Trials in situ

    Performance of trenching trials for the construction works of the French offshore windfarms.
    Burial system : ROVJET806 (jetting) + TM03 (trencher / vibrating plough)
    Plus d’infos