2011 DELMA REPAIR

Provision of submarine power cable repair assistance. Post burial of cable / Installation of Uraducts.

Location : Delma Island (UAE)
Client : NEXANS

Length (km): 0.1
Water depth (m) : 6
Vessel : Barge
Burial system : Dredge pump (with divers)
Burial depth (m) : 1
Product : Power Cable
Weight (kg/m) : 55
Diameter : 194 mm