Home » Projets » 2011 DELMA REPAIR

2011 DELMA REPAIR

Provision of submarine power cable repair assistance. Post burial of cable / Installation of Uraducts.

Location : Delma Island (UAE)
Client : NEXANS

Length (km): 0.1
Water depth (m) : 6
Vessel : Barge
Burial system : Dredge pump (with divers)
Burial depth (m) : 1
Product : Power Cable
Weight (kg/m) : 55
Diameter : 194 mm

Other projects

  • 2011 WACS

    FO cable separate and direct shore ends in Congo and Angola / PLIB / installation of mattresses with ROS
    Burial system : TJV05 – EBJ (jetting) – ROS (mattresses)
    Plus d’infos
  • 2009 IMEWE/MENA/TEN/EIG

    FO cable shore ends, PLIB and installation of articulated pipes.
    Burial system : TO Mobile
    Plus d’infos
  • 2023 HKZ Project

    Assistance to laying, PLIB
    Burial system :
    Plus d’infos