Post Lay Inspection and Burial of 32 infield power cables.
Location : Ormonde Offshore Windfarm – Irish Sea
Client : VSMC-ORMONDE ENERGY
Length (km): 19.3
Water depth (m) : 21
Vessel : DP vessel
Burial system : ROVJET605 (jetting) 
Burial depth (m) : 2
Product : Power Cable
Weight (kg/m) : max 25
Diameter : max 139 mm

Other projects

  • 1998-1999 VNF PARIS

    Along river / Laying and burial of 3 multiple FO cables laid in one go
    Burial system : ESV 07 / ESV11 (Plough)
    Plus d’infos
  • 2008 PERENCO RDC

    Cable laying and burial between mainland and platforms. Barge operating for pipe laying + special liftings + J-tube pullin.
    Burial system : EBJ 04 (jetting)
    Plus d’infos
  • 2023 GABON

    Separate landing in Libreville. Laying and post-wiring of 16.9 km of fiber optic cable
    Burial system :