Home » Projets » 2015 ABU ALI

2015 ABU ALI

Provision of personnel and equipment to carry out the trenching of 2 x 230 kV power cables in shallow water.

Location : Abu Ali – Saudi Arabia
Client : Mc Dermott Arabia Company Ltd

Product : Power Cable
Length (km): 2 x 5.9 km
Water depth (m) : 0 to 11
Vessel : Barge
Burial system : TM03 (trenching)
Burial depth (m) : 1.3
Weight (kg/m) : 96
Diameter : 237 mm

Other projects

  • 2015 AMRUMBANK

    Provision of personnel and equipment to carry out the post burial of 86 infield power cables.
    Burial system : ROVJET810 (jetting)
    Plus d’infos
  • 2020 Partnership with UXO Control

    Offshore campaign to identify and eliminate unexposed ammunition (UXO) on the site of the Saint-Brieuc wind farm
    Burial system : TRITON XLX200HP and ROV C 113
    Plus d’infos
  • 2013 ANHOLT

    Post Lay Inspection and Burial of 111 infield power cables
    Burial system : ROVJET806 (jetting)
    Plus d’infos