2016 FITZROY Darwin

1 separate shore end. 3km cable installation with laying and post burial.  Installation of articulated pipes.

Location : Darwin / Australia
Client : Alcatel-Lucent Submarine Networks Ltd

Product : Fibre optic cable
Length (km): 3
Water depth (m) : up to 20 m
Vessel : Barge
Burial system : TO Mobile (jetting)
Burial depth (m) : 2
Weight (kg/m) : 3.5
Diameter (mm) : 35

Other projects

  • 2017 SAFANIYA 5

    Provision of personnel and equipment to carry out trenching services on five 15 kV submarine power cables.
    Burial system : TM03 (trencher)
    Plus d’infos
  • 2014 SAFANIYA 2

    Provision of personnel and equipment to carry out the trenching of a 115 kV power composite cable in shallow water.
    Burial system : TM03 (trenching)
    Plus d’infos
  • 2000 VNF LILLE

    Along river – canal / 1 telecommunication fibre optic cable.
    Burial system : Machine LD CABLE : Towed plough
    Plus d’infos