2016 FITZROY Darwin

1 separate shore end. 3km cable installation with laying and post burial.  Installation of articulated pipes.

Location : Darwin / Australia
Client : Alcatel-Lucent Submarine Networks Ltd

Product : Fibre optic cable
Length (km): 3
Water depth (m) : up to 20 m
Vessel : Barge
Burial system : TO Mobile (jetting)
Burial depth (m) : 2
Weight (kg/m) : 3.5
Diameter (mm) : 35

Other projects

  • 1996 THAILANDE

    KO PHANGAN island to KOH SAMUI island / Laying and burial of 33 kV power cable
    Burial system : TM02 (Trencher) – TJV04 (Jetting)
    Plus d’infos
  • 2011 ORMONDE WINDFARM

    Post Lay Inspection and Burial of 32 infield power cables.
    Burial system : ROVJET605 (jetting)
    Plus d’infos
  • 2016 NORDSEE ONE

    Provision of personnel and equipment to carry out the post lay burial of 54 infield power cables.
    Burial system : ROVJET 810 (jetting)