Home » Projets » 2016 FITZROY Darwin

2016 FITZROY Darwin

1 separate shore end. 3km cable installation with laying and post burial.  Installation of articulated pipes.

Location : Darwin / Australia
Client : Alcatel-Lucent Submarine Networks Ltd

Product : Fibre optic cable
Length (km): 3
Water depth (m) : up to 20 m
Vessel : Barge
Burial system : TO Mobile (jetting)
Burial depth (m) : 2
Weight (kg/m) : 3.5
Diameter (mm) : 35

Other projects

  • 1999 CIRCE

    Cable deburial / reburial and cable loop burial on CIRCE fibre optic cable system.
    Burial system : MED1 (Dredge pump) – CASTOR (Trencher)
    Plus d’infos
  • 2013 ANHOLT

    Post Lay Inspection and Burial of 111 infield power cables
    Burial system : ROVJET806 (jetting)
    Plus d’infos
  • 2023 CFXD

    Assistance to laying, PLIB
    Burial system :
    Plus d’infos