Home » Projets » 2023 CFXD

2023 CFXD

Assistance to laying, PLIB

Location: Taiwan
Customer: SEAWAY 7

Length (km): 292 km
Water depth (m) :
Vessel: Seaway Phoenix
Beaching system: ROVJET 1206
Beaching depth (m): 1.5m
Product : Power cable
cable type: ø

Other projects

  • 2018 ASC Indonesia

    Post lay inspection and burial of 41 km of fibre optic cable.
    Burial system : ROVJET 605 (jetting)
    Plus d’infos
  • 1997 SOUTH KOREA

    Main land to Island / HVDC power cable extension with piggy-backed fibre optic cable
    Burial system : COPS (mattresses protection)
    Plus d’infos
  • 2013 VISCAS SIR BANYAS

    Lay and burial of 2×13 km of 132kV power cable + 2x13km FO cable between Shuweihat and SIR BANIYAS (mainland to Island)
    Burial system : TM04 (trencher)
    Plus d’infos