Home » Projets » 2018 ASC Indonesia

2018 ASC Indonesia

Post lay inspection and burial of 41 km of fibre optic cable.

Location : Indonesia
Client : Optic Marine Services Iternational Ltd

Product : Fibre optic cable 
Length (km): 41
Water depth (m) : up to 100 m
Vessel : DP Vessel
Burial system : ROVJET 605 (jetting)
Burial depth (m) : 1.5

Other projects

  • 2008 PERENCO – CAMEROON

    Barge operating for pipe laying
    Burial system : N.A.
    Plus d’infos
  • 2023 ZAKYNTIS

    LD Travocean was subcontracted by Asso Subsea for trenching work. ROVJET 1217 was deployed on the TSV MV Astrea to carry out PLB water jet cleaning on the 21 km electrical interconnection.
    Burial system :
    Plus d’infos
  • 2024 MORAY WEST

    Assistance to laying
    Burial system :
    Plus d’infos