Home » Projets » 2018 ASC Indonesia

2018 ASC Indonesia

Post lay inspection and burial of 41 km of fibre optic cable.

Location : Indonesia
Client : Optic Marine Services Iternational Ltd

Product : Fibre optic cable 
Length (km): 41
Water depth (m) : up to 100 m
Vessel : DP Vessel
Burial system : ROVJET 605 (jetting)
Burial depth (m) : 1.5

Other projects

  • 2023 ANGOLA

    Separate landing in Luanda. Laying and post-wiring of 7.2 km of fiber-optic cable
    Burial system :
    Plus d’infos
  • 2016 AL NASR QAFFAY

    Cable laying and burial between mainland and Qaffay Island.
    Burial system : TM04 (trenching)
    Plus d’infos
  • 2018 MERKUR OWF

    Provision of personnel and equipment to carry out the post lay burial of 57 infield power cables.
    Burial system : ROVJET 1210 (jetting)
    Plus d’infos