Home » Projets » 1999 DCN TOULON

1999 DCN TOULON

Power and composite cables inside miltary harbour.

Location : FRANCE / TOULON
Client : ALCATEL CABLE / DCN

Length (km): 5,8
Water depth (m) : 12
Vessel : Inflatable / works craft
Burial system : N.A.
Burial depth (m) : N.A.
Product : Composite
Weight (kg/m) : 15
Diameter : 88 mm

Other projects

  • 2007 ATLAS OFFSHORE

    FO cable shore ends – Post lay burial
    Burial system : EBJ 04 (jetting)
    Plus d’infos
  • 2024 MORAY WEST

    Assistance to laying
    Burial system :
    Plus d’infos
  • 2021 YUNLIN OWF

    Provision of personnel and equipment to carry out the post lay burial of infield array cables.
    Burial system :
    Plus d’infos