2002 FLAG SOUTH PLIB

PLIB works on telecommunication fibre optic cable

Location : FRENCH BRITTANY coasts / FLAG Atlantic 1 South segment
Client : ALCATEL SUBMARINE NETWORKS

Length (km): 11,2
Water depth (m) : 60
Vessel : DP Vessel
Burial system : MED1 (Crawler fitted with dredge pump)
Burial depth (m) : 1
Product : Fibre optic cable
Weight (kg/m) : 5
Diameter : 56 mm