Home » Projets » 2002 FLAG SOUTH PLIB

2002 FLAG SOUTH PLIB

PLIB works on telecommunication fibre optic cable

Location : FRENCH BRITTANY coasts / FLAG Atlantic 1 South segment
Client : ALCATEL SUBMARINE NETWORKS

Length (km): 11,2
Water depth (m) : 60
Vessel : DP Vessel
Burial system : MED1 (Crawler fitted with dredge pump)
Burial depth (m) : 1
Product : Fibre optic cable
Weight (kg/m) : 5
Diameter : 56 mm

Other projects

  • 2008 PERENCO – CAMEROON

    Barge operating for pipe laying
    Burial system : N.A.
    Plus d’infos
  • 2015 MANIFA

    Provision of personnel and equipment to carry out the trenching of 3 power cables and 2 fiber optic cables.
    Burial system : TM03 (trencher)
    Plus d’infos
  • 2025 2 AFRICA PEARLS

    Separate landing at Al Khobar. Laying and post-wiring of 35 km of fiber optic cable
    Burial system :
    Plus d’infos