Home » Projets » 2000 Dumpton Gap – Level 3

2000 Dumpton Gap – Level 3

Remedial work : Lay and simultaneous burial of fibre optic cable.

Location : ENGLISH CHANNEL
Client : Offshore DUMPTON GAP LEVEL 3 FO cable system (ALCATEL SUBMARINE NETWORKS)

Length (km): 5,4
Water depth (m) : 25
Vessel : Barge
Burial system : ESV11 (Plough)
Burial depth (m) : 1,4
Product : Fibre optic cable
Weight (kg/m) : 5,4
Diameter : 46 mm