Home » Projets » 2003 IFA 2000 – CABLE 11 REPAIR

2003 IFA 2000 – CABLE 11 REPAIR

500 MW HVDC Power cable repair.

Location : FRANCE to ENGLAND Channel
Client : RTE

Length (km): 0,6
Water depth (m) : 25
Vessel : Barge
Burial system : MED1 (Dredge pump)
Burial depth (m) : 0,6
Product : Power Cable
Weight (kg/m) : 35
Diameter : 108 mm

Other projects

  • 2023 SeaGreen

    Assistance to laying, PLIB
    Burial system :
    Plus d’infos
  • 2016 FITZROY Darwin

    1 separate shore end. 3km cable installation with laying and post burial. Installation of articulated pipes.
    Burial system : TO Mobile (jetting)
    Plus d’infos
  • 2017 LTAII

    Provision of personnel and equipment to carry out trebsching services on a total of 10 submarine power cables.
    Burial system : TM03 + TM04 (trenchers)
    Plus d’infos