2023 ZAKYNTIS

LD Travocean was subcontracted by Asso Subsea for trenching work. ROVJET 1217 was deployed on the TSV MV Astrea to carry out PLB water jet cleaning on the 21 km electrical interconnection.

Location: Greece
Customer : ASSO SUBSEA

Length (km): 16.2 km
Water depth (m): maximum 515 m
Vessel: MV ASTREA
Beaming system: ROVJET 1217
Beaming depth (m): 2.1 m
Product : Power cable
cable type: 2 types of jointed cable:
ø22cm
ø21cm