Home » Projets » 2004 SIMIAN SAPHIRE

2004 SIMIAN SAPHIRE

Provision of nearshore trenching services.

Location : Golf of Alexandria – EGYPT
Client : TECHNIP OFFSHORE UK Ltd

Length (km): 3
Water depth (m) : 11
Vessel : Barge
Burial system : TJV06 (Jetting)
Burial depth (m) : 1,5
Product : Flexible pipeline
Weight (kg/m) : 60
Diameter : 2×4″ and 1×10″

Other projects

  • 2024 DOGGER BANK B

    Supply of trenching support services, including personnel and equipment on board a dedicated trenching support vessel (TSV), for the Dogger Bank offshore wind farm inter-turbine cable installation and protection project.
    Burial system :
    Plus d’infos
  • 2014 EMF Trials in situ

    Performance of trenching trials for the construction works of the French offshore windfarms.
    Burial system : ROVJET806 (jetting) + TM03 (trencher / vibrating plough)
    Plus d’infos
  • 2018 ASC Perth

    1 separate shore end. 10 km cable installation with laying and burial.  Installation of articulated pipes.
    Burial system : TO Mobile (jetting)
    Plus d’infos