Home » Projets » 2004 SIMIAN SAPHIRE

2004 SIMIAN SAPHIRE

Provision of nearshore trenching services.

Location : Golf of Alexandria – EGYPT
Client : TECHNIP OFFSHORE UK Ltd

Length (km): 3
Water depth (m) : 11
Vessel : Barge
Burial system : TJV06 (Jetting)
Burial depth (m) : 1,5
Product : Flexible pipeline
Weight (kg/m) : 60
Diameter : 2×4″ and 1×10″

Other projects

  • 2011 DELMA REPAIR

    Provision of submarine power cable repair assistance.
    Burial system : Dredge pump (with divers)
    Plus d’infos
  • 2024 HAI LONG

    Post Lay Burial of EXP
    Burial system :
    Plus d’infos
  • 2016 AL NASR QAFFAY

    Cable laying and burial between mainland and Qaffay Island.
    Burial system : TM04 (trenching)
    Plus d’infos