2004 SIMIAN SAPHIRE

Provision of nearshore trenching services.

Location : Golf of Alexandria – EGYPT
Client : TECHNIP OFFSHORE UK Ltd

Length (km): 3
Water depth (m) : 11
Vessel : Barge
Burial system : TJV06 (Jetting)
Burial depth (m) : 1,5
Product : Flexible pipeline
Weight (kg/m) : 60
Diameter : 2×4″ and 1×10″

Other projects

  • 2020 Dunant

    Pre lay shore end. 5 km cable installation with laying and burial. Installation of articulated pipes.
    Burial system : TO Mobile (jetting)
    Plus d’infos
  • 2024 HAI LONG

    Post Lay Burial of EXP
    Burial system :
    Plus d’infos
  • 1997 SOUTH KOREA

    Main land to Island / HVDC power cable extension with piggy-backed fibre optic cable
    Burial system : COPS (mattresses protection)
    Plus d’infos