Provision of nearshore trenching services.

Location : Golf of Alexandria – EGYPT
Client : TECHNIP OFFSHORE UK Ltd

Length (km): 3
Water depth (m) : 11
Vessel : Barge
Burial system : TJV06 (Jetting)
Burial depth (m) : 1,5
Product : Flexible pipeline
Weight (kg/m) : 60
Diameter : 2×4″ and 1×10″