Home » Projets » 2006 THAILAND KHO SAMUI

2006 THAILAND KHO SAMUI

Shore ends/Mainland to island/Laying and burial of 115 kV power cable

Location : Gulf of Thailand
Client : NEXANS NORWAY

Length (km): 24
Water depth (m) : 28
Vessel : Barge
Burial system : TJV05 + TJV08 : Jetting
Burial depth (m) : 1,5
Product : Power Cable
Weight (kg/m) : 52
Diameter : 169 mm

Other projects

  • 2015 BALTIC 2

    Provision of personnel and equipment to carry out the post burial of 75 infield power cables.
    Burial system : ROVJET806 (jetting)
    Plus d’infos
  • 2001 ULYSSE

    Recover of existing cable (5 km), simultaneous lay and burial work (ESV12), PLIB work of joints (MED 1 and diver pump).
    Burial system : MED1 (Dredge pump) – ESV12 (Plough)
    Plus d’infos
  • 2000 PEC / LEVEL 3/ FLUTE

    PLIB works on telecom fibre optic cable crossings.
    Burial system : MED 1: Dredge pump / jetting tool
    Plus d’infos