Home » Projets » 2006 THAILAND KHO SAMUI

2006 THAILAND KHO SAMUI

Shore ends/Mainland to island/Laying and burial of 115 kV power cable

Location : Gulf of Thailand
Client : NEXANS NORWAY

Length (km): 24
Water depth (m) : 28
Vessel : Barge
Burial system : TJV05 + TJV08 : Jetting
Burial depth (m) : 1,5
Product : Power Cable
Weight (kg/m) : 52
Diameter : 169 mm

Other projects

  • 2008 PERENCO RDC

    Cable laying and burial between mainland and platforms. Barge operating for pipe laying + special liftings + J-tube pullin.
    Burial system : EBJ 04 (jetting)
    Plus d’infos
  • 2001 APOLLO UK SHORE END

    Cable lay and burial BUDE shore end (UK).
    Burial system : TJV04 (Jetting)
    Plus d’infos
  • 2016 NORDSEE ONE

    Provision of personnel and equipment to carry out the post lay burial of 54 infield power cables.
    Burial system : ROVJET 810 (jetting)
    Plus d’infos