2008 DELMA

Post trenching of 2 power cables between Shuwaihat (mainland) and Delma Island. Installation of articulated pipes.

Location : Delma Island (UAE)
Client : NEXANS Norway

Length (km): 85
Water depth (m) : 35
Vessel : Barge
Burial system : TM04 (Trencher)
Burial depth (m) : 1
Product : Power Cable
Weight (kg/m) : 55
Diameter : 194 mm

Other projects

  • 2024 DOGGER BANK B

    Supply of trenching support services, including personnel and equipment on board a dedicated trenching support vessel (TSV), for the Dogger Bank offshore wind farm inter-turbine cable installation and protection project.
    Burial system :
    Plus d’infos
  • 2017 SAFANIYA 5

    Provision of personnel and equipment to carry out trenching services on five 15 kV submarine power cables.
    Burial system : TM03 (trencher)
    Plus d’infos
  • 2025 2 AFRICA PEARLS BARHEIN

    Separate landing in Bahrain. Laying and post-wiring 35 km of fiber optic cable
    Burial system :