Home » Projets » 2008 PERENCO – CAMEROON

2008 PERENCO – CAMEROON

Barge operating for pipe laying

Location : CAMEROON
Client : PERENCO

Length (km): 8,6
Water depth (m) : 35
Vessel : Barge
Burial system : N.A.
Burial depth (m) : N.A.
Product : Flexible pipeline
Weight (kg/m) : 
Diameter : 8 mm