Home » Projets » 2008 PERENCO – CAMEROON

2008 PERENCO – CAMEROON

Barge operating for pipe laying

Location : CAMEROON
Client : PERENCO

Length (km): 8,6
Water depth (m) : 35
Vessel : Barge
Burial system : N.A.
Burial depth (m) : N.A.
Product : Flexible pipeline
Weight (kg/m) : 
Diameter : 8 mm

Other projects

  • 2011 WALNEY 1

    Post Lay Inspection and Burial of infield power cables
    Burial system : ROVJET605 (jetting)
    Plus d’infos
  • 1997 SOUTH KOREA

    Main land to Island / HVDC power cable extension with piggy-backed fibre optic cable
    Burial system : COPS (mattresses protection)
    Plus d’infos
  • 2016 AL NASR QAFFAY

    Cable laying and burial between mainland and Qaffay Island.
    Burial system : TM04 (trenching)
    Plus d’infos