2015 AMRUMBANK

Provision of personnel and equipment to carry out the post burial of 86 infield power cables.

Location : AMRUMBANK Offshore Windfarm / German North Sea
Client : Siem Offshore Contractors

Product : Power Cable 
Length (km): 75
Water depth (m) : up to 24 m
Vessel : DP Vessel
Burial system : ROVJET810 (jetting)
Burial depth (m) : 1.6
Weight (kg/m) : up to 36 kg/m
Diameter : up to 145 mm

Other projects

  • 2008 PERENCO RDC

    Cable laying and burial between mainland and platforms. Barge operating for pipe laying + special liftings + J-tube pullin.
    Burial system : EBJ 04 (jetting)
    Plus d’infos
  • 2022 2 AFRICA Spain

    1 x Direct landing in Barcelona, shell installation and post-burial. Installation of grounding system
    Burial system :
    Plus d’infos
  • 2001 ULYSSE

    Recover of existing cable (5 km), simultaneous lay and burial work (ESV12), PLIB work of joints (MED 1 and diver pump).
    Burial system : MED1 (Dredge pump) – ESV12 (Plough)
    Plus d’infos