Home » Projets » 2008 PERENCO – CAMEROON

2008 PERENCO – CAMEROON

Barge operating for pipe laying

Location : CAMEROON
Client : PERENCO

Length (km): 8,6
Water depth (m) : 35
Vessel : Barge
Burial system : N.A.
Burial depth (m) : N.A.
Product : Flexible pipeline
Weight (kg/m) : 
Diameter : 8 mm

Other projects

  • 2023 BLUE MARSEILLE

    1 x Reverse Shore end in Marseilles , laying of seagrass anchors, laying of sinks, post-silting
    Burial system :
    Plus d’infos
  • 2022 2 AFRICA SOUTH AFRICA

    1 x Direct landing at Duynfontein, shell installation and post-burial. Installation of grounding system
    Burial system :
    Plus d’infos
  • 2000 FLAG ATLANTIC 1

    3 separate shore end installations as part of the FLAG Atlantic 1 telecommunication cable system.
    Burial system : MED1 (Jetting) and ESV11 (Plough)
    Plus d’infos