Home » Projets » 2008 PERENCO RDC

2008 PERENCO RDC

Cable laying and burial between mainland and platforms. Barge operating for pipe laying + special liftings + J-tube pullin.

Location : Democratic Republic of the Congo
Client : PERENCO

Length (km): 22
Water depth (m) : 20
Vessel : Barge
Burial system : EBJ 04 (jetting)
Burial depth (m) : 0,8
Product : Power Cable
Weight (kg/m) : 7
Diameter : 96 mm

Other projects

  • 2001 ANTARES

    Cable lay between LA SEYNE SUR MER and the Neutrinos Telescope ANTARES (max. depth 2400 m).
    Burial system : N.A.
    Plus d’infos
  • 2010 HONOTUA

    FO cable shore ends, PLIB and installation of articulated pipes.
    Burial system : Dredge pump (with divers)
    Plus d’infos
  • 2016 NORDSEE ONE

    Provision of personnel and equipment to carry out the post lay burial of 54 infield power cables.
    Burial system : ROVJET 810 (jetting)
    Plus d’infos