Home » Projets » 2008 TAURT FIELD DEVELOPMENT

2008 TAURT FIELD DEVELOPMENT

Post trenching of subsea umbilical / PLIB

Location : Egypt
Client : Five Oceans Services – BP

Length (km): 64
Water depth (m) : 110
Vessel : DP Vessel
Burial system : ROVJET401 (Jetting)
Burial depth (m) : 1,5
Product : Umbilical
Weight (kg/m) : 5,9
Diameter : 104 mm

Other projects

  • 2001 ANTARES

    Cable lay between LA SEYNE SUR MER and the Neutrinos Telescope ANTARES (max. depth 2400 m).
    Burial system : N.A.
    Plus d’infos
  • 2023 GHANA 2

    Recovery and replacement of damaged Ace cable in Accra. Laying and post-wiring of 5 km of fiber optic cable
    Burial system :
    Plus d’infos
  • 2005 FALCON

    Separate shore ends / Laying and burial of FO cable
    Burial system : TJV05 – EBJ03 (Jetting)
    Plus d’infos