2014 BUTENDIEK
Provision of personnel and equipment to carry out the post burial of 86 infield power cables.
Location : BUTENDIEK Offshore Windfarm / German North Sea
Client : VBMS
Product : Power Cable
Length (km): 81
Water depth (m) : up to 22 m
Vessel : DP Vessel
Burial system : ROVJET806 (jetting)
Burial depth (m) : 1
Weight (kg/m) : –
Diameter : –
Length (km): 81
Water depth (m) : up to 22 m
Vessel : DP Vessel
Burial system : ROVJET806 (jetting)
Burial depth (m) : 1
Weight (kg/m) : –
Diameter : –
Download the project sheet