Home » Projets » 2014 BUTENDIEK

2014 BUTENDIEK

Provision of personnel and equipment to carry out the post burial of 86 infield power cables.

Location : BUTENDIEK Offshore Windfarm / German North Sea
Client : VBMS

Product : Power Cable 
Length (km): 81
Water depth (m) : up to 22 m
Vessel : DP Vessel
Burial system : ROVJET806 (jetting)
Burial depth (m) : 1
Weight (kg/m) : –
Diameter : 

Other projects

  • 2016 VEJA MATE

    Provision of personnel and equipment to carry out the post lay burial of 73 infield power cables.
    Burial system : ROVJET 810 (jetting)
    Plus d’infos
  • 2022 EQUIANO

    1 x Direct landing at Sesimbra, shell installation and post-burial.
    Burial system :
    Plus d’infos
  • 2001 SAT 3

    DOUALA and LIBREVILLE shore ends / Laying and burial of FO cable
    Burial system : TJV05 – TJV04 (Jetting) + ESV12 (Plough)
    Plus d’infos