Home » Projets » 2010 MANIFA

2010 MANIFA

Provison of technical and engineering services / Cable laying and trenching services.

Location : Manifa oil field
Client : Valentine Maritime Saudi Ltd

Length (km): 29,2
Water depth (m) : 11
Vessel : Barge
Burial system : TM04 (Trencher)
Burial depth (m) : 1
Product : Power cable

Other projects

  • 2015 SEA LION Rostock

    1 shore end in Germany + Laying and burial of the same cable offshore in Denmark, in low water depths.
    Burial system : ROVJET404 + EBJ (jetting)
    Plus d’infos
  • 2005 PERENCO Gabon

    Mainland to platforms. Surface lay + J-tube Pull-In
    Burial system : N.A.
    Plus d’infos
  • 2024 2 AFRICA PEARLS

    1 x Direct landing in Salalah, shell installation, post-sinking. Installation of grounding system
    Burial system :
    Plus d’infos