Home » Projets » 2024 NIGERIA

2024 NIGERIA

Separate landing in Lagos. 2.8 km of fibre-optic cable sunk in water

Location: Lagos NIGERIA
Customer : ALCATEL SUBMARINE NETWORKS

Length (km): 2.8 km
Water depth (m) :
Vessel: NORA B
Beam system: TO MOBILE / NV
Beam depth (m): 2.0 m
Product : Fiber optic cable
cable type: ø37mm

Other projects

  • 2021 EAUFON

    Separate shore ends in Chisasibi river. Laying and burial of 19 km of fibre optic cable. Installation of articulated pipes .
    Burial system :
    Plus d’infos
  • 2012 THORNTON BANK

    Post-Lay burial of the export power cable of the Thornton Bank Offshore Windfarm.
    Burial system : ROVJET605 + ROVJET806 (jetting)
    Plus d’infos
  • 2001 SAT 3

    DOUALA and LIBREVILLE shore ends / Laying and burial of FO cable
    Burial system : TJV05 – TJV04 (Jetting) + ESV12 (Plough)
    Plus d’infos