Home » Projets » 2024 NIGERIA

2024 NIGERIA

Separate landing in Lagos. 2.8 km of fibre-optic cable sunk in water

Location: Lagos NIGERIA
Customer : ALCATEL SUBMARINE NETWORKS

Length (km): 2.8 km
Water depth (m) :
Vessel: NORA B
Beam system: TO MOBILE / NV
Beam depth (m): 2.0 m
Product : Fiber optic cable
cable type: ø37mm

Other projects

  • 2025 2 AFRICA PEARLS BARHEIN

    Separate landing in Bahrain. Laying and post-wiring 35 km of fiber optic cable
    Burial system :
    Plus d’infos
  • 2002 FLAG SOUTH PLIB

    PLIB works on telecommunication fibre optic cable.
    Burial system : MED1 (Dredge pump)
    Plus d’infos
  • 2026 Lumalink

    Mobilization of the DP barge in Panama, followed by towed transit to Cayenne (French Guiana). Separate shore-end landing, simultaneous laying and burial of 15 km of fiber optic cable.
    Burial system :
    Plus d’infos