Home » Projets » 2013 ANHOLT

2013 ANHOLT

Post Lay Inspection and Burial of 111 infield power cables

Location : ANHOLT Offshore Windfarm / Kattegat Sea (DANEMARK)
Client : VSMC/DONG

Product : Power Cable 
Length (km): 141
Water depth (m) : 14 to 20
Vessel : DP Vessel
Burial system : ROVJET806 (jetting)
Burial depth (m) : 1.5 
Weight (kg/m) : max 34
Diameter : max 140 mm