2011 WACS

2 separate FO shore-ends in Muanda (Congo Kinshasa) and Matombi (Congo Brazzaville) + 1 direct FO shore-end in Cabo Ledo (Angola). Installation of mattresses with ROS.

Location : Congo-Angola
Client : ALCATEL LUCENT

Length (km): 38
Water depth (m) : 20
Vessel : DP2 Barge
Burial system : TJV05 – EBJ (jetting) – ROS (mattresses)
Burial depth (m) : 1
Product : Fibre optic cable

Other projects

  • 2015 ABU ALI

    Provision of personnel and equipment to carry out the post lay trenching of a 15 kV power composite cable.
    Burial system : TM03 (trenching)
    Plus d’infos
  • 2001 I 2 I / Shore end MADRAS

    Cable lay and burial – 8 km CHENNAI shore end.
    Burial system : TJV05 + TJV04 (Jetting) + ESV07 (Plough)
    Plus d’infos
  • 2019 SVERDRUP

    Post lay burial of 199 km of sismic fibre optic cables in Johan Sverdrup field
    Burial system : ROVJET 1206 (jetting)
    Plus d’infos