2011 WACS

2 separate FO shore-ends in Muanda (Congo Kinshasa) and Matombi (Congo Brazzaville) + 1 direct FO shore-end in Cabo Ledo (Angola). Installation of mattresses with ROS.

Location : Congo-Angola
Client : ALCATEL LUCENT

Length (km): 38
Water depth (m) : 20
Vessel : DP2 Barge
Burial system : TJV05 – EBJ (jetting) – ROS (mattresses)
Burial depth (m) : 1
Product : Fibre optic cable