2 separate FO shore-ends in Muanda (Congo Kinshasa) and Matombi (Congo Brazzaville) + 1 direct FO shore-end in Cabo Ledo (Angola). Installation of mattresses with ROS.

Location : Congo-Angola
Client : ALCATEL LUCENT

Length (km): 38
Water depth (m) : 20
Vessel : DP2 Barge
Burial system : TJV05 – EBJ (jetting) – ROS (mattresses)
Burial depth (m) : 1
Product : Fibre optic cable

Other projects

  • 2018 INDIGO

    Post lay inspection and burial of 39 km of fibre optic cable.
    Burial system : ROVJET 605 (jetting)
    Plus d’infos
  • 2012 PAIMPOL BRÉHAT

    Main DC power cable installation between mainland and 15 km offshore as part of EDF’s tidal generation project.
    Burial system : TM03 (trencher)
    Plus d’infos
  • 2023 ANGOLA

    Separate landing in Luanda. Laying and post-wiring of 7.2 km of fiber-optic cable
    Burial system :